Management, Wetlands/Floodplain, Littoral Zone Evaluation and Study, Eielson Air Force Base, Alaska - The primary objective of this requirement is to evaluate effectiveness of past riparian habitat...more
Eielson Air Force Base 354 CES/CEIE, Natural Resources Management, Wetlands/Floodplain – RAM FTQWA5324915-A – The primary objective of this project is to assist Eielson Air Force Base...more
Eielson AFB Central Heat and Power Plant Cooling Pond Vegetation Removal in Support of Bird Air Strike Hazard Reduction – The primary objectives of this project are to assist Eielson Air Force...more
Management, Species, Harbor Porpoise, (RAM#FXSBA53247215-A), Joint Base Elmendorf-Richardson, Alaska - The objectives of this requirement are to (1) determine Harbor Porpoise presence in Knik Arm...more
Tanana Flats Training Area All Season Road and Gravel Production, Fort Wainwright, Alaska SOW 21-108. The objectives of this scope of work are to implement the Integrated Natural Resources Management...more
Seabird Monitoring and Predator Management at Koke’e Air Force Station, Kauai - All tasks associated with this requirement have an avian and/or predator control focus and shall be conducted on...more
Donnelly Training Area, Black Rapids Training Area, and Yukon Training Area Trail and Streambank Improvements, US Army Garrison-Alaska (USAG-AK), Fort Wainwright, Alaska - The primary objectives of...more
11th Airborne Division (Arctic) and U.S. Army Alaska Land Rehabilitation and Maintenance (LRAM), Richardson Training Area, Alaska - The primary objective of this requirement is to implement the...more
Fort Wainwright Alaska and Donnelly Training Area Land Rehabilitation and Maintenance Support, Fort Wainwright, Alaska - The primary objective of this requirement is to implement the Integrated...more
In the world of social enterprises, failure is a cringe-worthy moment nobody wants to talk about. But, social entrepreneurs can benefit from their failures.